Construction of the new pool and facilities is continuing.

Pouring of concrete for the leisure pool, zero-depth splash park, plant room and pavilion is underway. 

 

Information updated 20 April 2024

Excavations are complete, concrete being poured and construction of Winchelsea’s new pools is underway.

The shapes of the 25-metre and leisure pools are visible on the Barwon Terrace site and contractors have driven pile foundations and poured concrete to form the new pools during the past couple of weeks.

Construction of a new pavilion and plant room will start at the end of May and the entire project is scheduled for completion during next summer.

The project, being delivered by Bowden Corp, includes replacement of 25-metre and leisure pools and addition of a zero-depth splash park which is great for small kids.

The new pavilion and entry point will be built at the south-east end of the site, providing better connection with adjoining recreation and playground facilities.

Contractors salvaged almost 96 per cent of materials from demolition of the previous pools, surroundings and buildings – totalling more than 817 tonnes – for recycled use off-site.

The total included 15 tonnes of steel, 750 tonnes of concrete and brick and 10 tonnes of timber.

The former pool was decommissioned in March having reached the end of its serviceable life after 60 years.

Responses from almost 300 people during community consultations helped shape redevelopment designs.

Winch pool concrete pour 2.jpg

Background information

Council resolved at its June meeting to award the construction contract to Bowden Corporation, providing a green light for the provision of renewed aquatic facilities for the town and region into the future.

The existing pool reached the end of its serviceable life after having provided summer fun for families and visitors since 1963.

The redevelopment will include:

  • Demolition and removal of the existing pools, pump house, amenity and shade structures and concrete concourses.
  • Renewal of 25-metre and leisure pools.
  • Renewal of concourses, pool surrounds and drainage systems.
  • Construction of a zero-depth splash park, with elements to be confirmed.
  • Construction of a plant room and amenities building incorporating kiosk, first aid, and office.

The redevelopment will occupy the same space on Barwon Terrace, but include the new splash park, and the amenities building will be relocated to the south-east of the site to create a more central entry point and better connection with the adjoining Adventure Park.

Input from earlier community engagement and a Community Reference Group will inform detailed design, and updates will be shared as the design process progresses.

Latest Designs

Below are the latest design images:  

WP pool view.JPG Winch pool render 6.3.24.JPG Winch pool render 6.3.24 Entry.JPG

For more information, please contact the Recreation Planning Team at info@surfcoast.vic.gov.au or 5261 0600.


Back to all Winchelsea projects